How to prepare for a tiler
Summary from this article...
Choosing tiles is often the easy part. Getting the room ready, arranging materials and making sure other work is completed in the right order can take more thought.
A little planning can help prevent delays and avoid unexpected costs. If you’re having a bathroom retiled, fitting a new kitchen floor or adding a splashback, here are the things worth sorting out before work begins.
Agree the work before setting a date
Start by confirming what’s included in the quotation. Removing old tiles, preparing the surface, levelling a floor and disposing of waste may be charged separately, depending on the project.
Ask who will supply the tiles, adhesive, grout and trims. Check whether moving appliances or removing sanitaryware is included, and discuss how any additional work will be handled if problems appear beneath the existing tiles.
This matters because the condition of the surface isn’t always clear until the old finish has been removed. If extra preparation is needed, you should understand why and agree the cost before the work continues.
Order your tiles in good time
Try to choose your tiles before confirming the installation date. Some products are readily available, while others may need to be ordered from a supplier.
The tile itself also affects how the job is carried out. Large porcelain tiles, natural stone and intricate patterns can require different preparation and installation methods from standard ceramic tiles.
Before ordering, check that the product is suitable for the intended location. Your tiler can help calculate the quantity needed, allowing for cuts and a reasonable spare allowance.
Remember the finishing details, too. Grout colour, edge trims and decorative pieces all contribute to the final appearance. Having these decisions made early makes it easier to plan the layout properly.
When the delivery arrives, check the quantity, size, finish and condition. Finding damaged or missing tiles before installation is much less disruptive than discovering the problem halfway through the job.
Clear the room and arrange access
You can make a real difference by clearing the working area before your tiler arrives.
Remove personal belongings, toiletries, loose furniture and anything else that will get in the way. In a kitchen, discuss whether appliances need to be moved. In a bathroom, establish whether the toilet, basin, bath or shower enclosure will remain in place.
Don’t assume that disconnecting appliances or removing sanitaryware is part of the tiling work. These jobs may need to be arranged separately with the appropriate tradesperson.
It’s also worth agreeing where materials can be stored and how the work area will be accessed. Cutting tiles and removing old finishes can create dust and noise, so consider nearby rooms and belongings that may need protection.
Check the surface before tiling begins
The condition of the wall or floor beneath the tiles is one of the biggest factors affecting the finished result.
The surface needs to be stable and suitable for the proposed installation. Depending on the room, it may also need levelling, repairs or specific preparation before adhesive can be applied.
Removing old tiles can reveal problems that weren’t visible beforehand. Loose plaster, damaged boards, cracks or signs of damp may need further attention.
If you’ve noticed movement, recurring cracks or previous water damage, mention it before work starts. These details can help your tiler assess what needs checking.
Avoid trying to repair or cover the surface yourself unless you’ve agreed the approach with your tiler. Using the wrong materials can create extra work rather than solve the problem.
Plan plumbing and electrical work
If the tiling is part of a larger renovation, get the order of work agreed early.
In a bathroom, the position of shower controls, pipe outlets, niches and fittings can affect the tile layout. In a kitchen, worktop dimensions, sockets and appliance positions can influence the height and arrangement of a splashback.
Changes made after tiling can mean drilling into finished surfaces or disturbing work that has already been completed.
Arrange plumbing and electrical work with the appropriate tradespeople, and confirm when their work needs to be finished. Your tiler should have the relevant measurements and layout details before installation starts.
Give waterproofing the attention it needs
Bathrooms and wet rooms require particular care. Tiles and grout alone do not make a shower waterproof.
Depending on the construction and the level of water exposure, a suitable waterproofing system may be needed beneath the tiled surface. The right approach depends on the substrate and the products being used.
Discuss this before the work begins. Make sure it’s clear who is responsible for the waterproofing and how the different stages will be coordinated.
This is not a detail to leave until the tiles are ready to go on the wall. Any necessary preparation should be completed at the appropriate stage and in accordance with the system manufacturer’s instructions.
Decide on the layout and finishing details
A tile can look quite different across an entire room than it does on a small sample. The layout deserves attention before installation begins.
Consider the direction of the tiles, grout colour, exposed edges and how the pattern will meet doorways, corners, worktops or adjoining flooring.
Large tiles and patterned designs can require more planning to achieve a balanced finish. Your tiler can assess the dimensions and explain how the layout may affect the position of cuts.
You don’t need to work out every measurement yourself. Make your preferences clear, ask about the practical options and agree the approach before the tiles are fixed.
Allow enough time for the job
The time needed for tiling depends on the size of the area, the tiles being used and the condition of the existing surface. Removing old tiles or carrying out substantial preparation can add to the schedule.
Some products also require specific curing times before the next stage can begin or the finished area can be used. These instructions need to be followed rather than shortened to meet a convenient deadline.
If you’re coordinating several trades, allow enough time between stages. A plumber finishing late or a floor needing additional preparation can affect the installation date.
Your tiler should be able to explain the expected timescale once the work has been assessed. If unexpected problems arise, the schedule may need to change.
What to have ready before your tiler arrives
Before the agreed start date, check that:
-
The scope of work and quotation are clear.
-
Tiles and specified materials have been ordered and checked.
-
The working area is accessible.
-
Appliances and sanitaryware have been discussed.
-
Known problems with the existing surface have been mentioned.
-
Plumbing and electrical work has been coordinated.
-
Layout, grout and finishing choices have been agreed.
-
Access, storage and waste arrangements are understood.
You don’t need to carry out the technical preparation yourself. The important thing is to have the right decisions made and responsibilities agreed.
What happens if a problem is discovered?
Sometimes removing the old finish reveals damage that couldn’t be seen beforehand. The substrate may need repairs or additional preparation before new tiles can be installed.
If this happens, ask your tiler to explain what has been found and what needs to be done. Any change to the work, price or schedule should be discussed before additional work proceeds.
It may be inconvenient to pause, but dealing with the underlying problem is better than covering it and risking further damage later.
Planning a tiling project?
Good tiling depends on more than the tiles you choose. The preparation, materials and order of work all affect the finished result.
Druston provides tiling services for projects across Somerset and Dorset. If you’re planning a new bathroom, kitchen splashback or tiled floor, explore our tiling services or contact us to discuss your requirements.